Demo preview. Sample data for FlowForge, a fictional company — produced by the real scoring engine once and frozen; nothing here is live or user data. Sign in to run this on your own operations →
Demo — checklist · all demos
Production Launch Readiness
in progressThe gate FlowForge runs before every major launch — derived from the launch-safety and reliability questions of the Production Readiness methodology.
7 of 8 items checked — every check is an explicit human action; nothing auto-passes.
- PassBackups restored into a scratch environment within the last 30 days
Checked 2026-09-03
RTO 41m, RPO 5m — within target.
- FailRollback path exercised for this release
Checked 2026-09-08
Manual SQL steps — tracked as roadmap P0.
- PassOn-call engineer confirmed for the launch window
Checked 2026-09-08
- PassDashboards and alerts cover the new code paths
Checked 2026-09-07
- PassFeature flagged with an off switch documented
Checked 2026-09-07
- PassStatus page and comms snippet drafted
Checked 2026-09-06
- Not checkedLoad test against projected launch peak
- N/ASOC2 evidence collected for the new datastore
Checked 2026-09-06
No new datastore in this launch.
Attaching evidence to a check documents the work; it never verifies it. A cancelled or completed run stays as a record — history is never rewritten.
← All demos·Run the live Quick assessment (no account needed)