Skip to main content
Demo preview. Sample data for FlowForge, a fictional company — produced by the real scoring engine once and frozen; nothing here is live or user data. Sign in to run this on your own operations →

Demo — checklist · all demos

Production Launch Readiness

in progress

The gate FlowForge runs before every major launch — derived from the launch-safety and reliability questions of the Production Readiness methodology.

7 of 8 items checked — every check is an explicit human action; nothing auto-passes.

  1. PassBackups restored into a scratch environment within the last 30 days

    Checked 2026-09-03

    RTO 41m, RPO 5m — within target.

  2. FailRollback path exercised for this release

    Checked 2026-09-08

    Manual SQL steps — tracked as roadmap P0.

  3. PassOn-call engineer confirmed for the launch window

    Checked 2026-09-08

  4. PassDashboards and alerts cover the new code paths

    Checked 2026-09-07

  5. PassFeature flagged with an off switch documented

    Checked 2026-09-07

  6. PassStatus page and comms snippet drafted

    Checked 2026-09-06

  7. Not checkedLoad test against projected launch peak
  8. N/ASOC2 evidence collected for the new datastore

    Checked 2026-09-06

    No new datastore in this launch.

Attaching evidence to a check documents the work; it never verifies it. A cancelled or completed run stays as a record — history is never rewritten.

← All demos·Run the live Quick assessment (no account needed)